## Summary
### Problem
The upgrade migration system required new workspaces to always start
from a workspace command, which was too rigid. When the system was
mid-upgrade within an instance command (IC) segment, workspace creation
would fail or produce inconsistent state.
### Solution
#### Workspace-scoped instance command rows
Instance commands now write upgrade migration rows for **all
active/suspended workspaces** alongside the global row. This means every
workspace has a complete migration history, including instance command
records.
- `InstanceCommandRunnerService` reloads `activeOrSuspendedWorkspaceIds`
immediately before writing records (both success and failure paths) to
mitigate race conditions with concurrent workspace creation.
- `recordUpgradeMigration` in `UpgradeMigrationService` accepts a
discriminated union over `status`, handles `error: unknown` formatting
internally, and writes global + workspace rows in batch.
#### Flexible initial cursor for new workspaces
`getInitialCursorForNewWorkspace` now accepts the last **attempted**
(not just completed) instance command with its status:
- If the IC is `completed` and the next step is a workspace segment →
cursor is set to the last WC of that segment (existing behavior).
- If the IC is `failed` or not the last of its segment → cursor is set
to that IC itself, preserving its status.
This allows workspaces to be created at any point during the upgrade
lifecycle, including mid-IC-segment and after IC failure.
#### Relaxed workspace segment validation
`validateWorkspaceCursorsAreInWorkspaceSegment` accepts workspaces whose
cursor is:
1. Within the current workspace segment, OR
2. At the immediately preceding instance command with `completed` status
(handles the `-w` single-workspace upgrade scenario).
Workspaces with cursors in a previous segment, ahead of the current
segment, or at a preceding IC with `failed` status are rejected.
### Test plan
created empty workspaces to allow testing upgrade with several active
workspaces