Commit Graph
3 Commits
Author SHA1 Message Date
Thomas TrompetteandGitHub 4370788023 Cancel in progress only if different event than merge (#18530)
As title
2026-03-10 14:25:35 +01:00
Charles BochetandGitHub ef499b6d47 Re-enable disabled lint rules and right-size CI runners (#18461)
## Summary

- Re-enable one lint rule that was temporarily disabled during the
ESLint-to-Oxlint migration:
- **`twenty/sort-css-properties-alphabetically`** in twenty-front — 578
violations auto-fixed across 390 files
- Document why **`typescript/consistent-type-imports`** cannot be
auto-fixed in twenty-server: NestJS relies on `emitDecoratorMetadata`
for DI, so converting constructor parameter imports to `import type`
erases them at compile time and breaks dependency injection at runtime
- Right-size CI runners, reducing 8-core usage from 18 jobs to 3:

| Change | Jobs | Rationale |
|--------|------|-----------|
| **Keep 8-core** | `ci-merge-queue/e2e-test`,
`ci-front/front-sb-build`, `ci-front/front-build` | Heavy builds needing
max CPU + memory (10GB NODE_OPTIONS, full Storybook webpack bundling) |
| **8-core → 4-core** | `ci-server` (build, lint-typecheck, validation,
test, integration-test), `ci-front/front-sb-test`,
`ci-zapier/server-setup`, `ci-sdk/sdk-e2e-test` | Already sharded into
10-12 parallel instances, I/O-bound (DB/Redis), or moderate single
builds |
| **8-core → 2-core** | `ci-emails/emails-test` | Trivially lightweight
(build + curl health check) |
| **Removed** | `ci-front/front-chromatic-deployment` | Dead code —
permanently disabled with `if: false` |

- Fix merge queue CI issues:
- **Concurrency**: Use `merge_group.base_ref` instead of unique merge
group ref so new queue entries cancel previous runs
- **Required status checks**: Add `merge_group` trigger to all 6
required CI workflows (front, server, shared, website, docker-compose,
sdk) with `changed-files-check` auto-skipped for merge_group events —
status check jobs auto-pass without re-running full CI
- **Build caching**: Add Nx build cache restore/save to E2E test job
with fallback to `main` branch cache for faster frontend and server
builds

## Test plan

- [ ] CI passes on this PR (verifies lint rule auto-fix works)
- [ ] Verify 4-core runner jobs complete within their 30-minute timeouts
- [ ] Verify merge queue status checks auto-pass (ci-front-status-check,
ci-server-status-check, etc.)
- [ ] Verify merge queue E2E concurrency cancels previous runs when a
new PR enters the queue
2026-03-06 13:33:02 +00:00
Charles BochetandGitHub d37ed7e07c Optimize merge queue to only run E2E and integrate prettier into lint (#18459)
## Summary

- **Merge queue optimization**: Created a dedicated
`ci-merge-queue.yaml` workflow that only runs Playwright E2E tests on
`ubuntu-latest-8-cores`. Removed `merge_group` trigger from all 7
existing CI workflows (front, server, shared, website, sdk, zapier,
docker-compose). The merge queue goes from ~30+ parallel jobs to a
single focused E2E job.
- **Label-based merge queue simulation**: Added `run-merge-queue` label
support so developers can trigger the exact merge queue E2E pipeline on
any open PR before it enters the queue.
- **Prettier in lint**: Chained `prettier --check` into `lint` and
`prettier --write` into `lint --configuration=fix` across `nx.json`
defaults, `twenty-front`, and `twenty-server`. Prettier formatting
errors are now caught by `lint` and fixed by `lint:fix` /
`lint:diff-with-main --configuration=fix`.

## After merge (manual repo settings)

Update GitHub branch protection required status checks:
1. Remove old per-workflow merge queue checks (`ci-front-status-check`,
`ci-e2e-status-check`, `ci-server-status-check`, etc.)
2. Add `ci-merge-queue-status-check` as the required check for the merge
queue
2026-03-06 13:20:57 +01:00