# Introduction
Migrating the workspace commands to the decorator version + timestamp
listing as for the instance commands
We've now been able to remove the upgrade command abstraction where we
needed to import all modules and order them
Now they're dynamically retrieved at upgrade runtime, sorted by
timestamp
## Instance and workspace commands name
The name is computed from the command metadata `version` `className` and
`timestamp` we have a duplicate validation at module init from the
unified registry
## Summary
- Re-enable one lint rule that was temporarily disabled during the
ESLint-to-Oxlint migration:
- **`twenty/sort-css-properties-alphabetically`** in twenty-front — 578
violations auto-fixed across 390 files
- Document why **`typescript/consistent-type-imports`** cannot be
auto-fixed in twenty-server: NestJS relies on `emitDecoratorMetadata`
for DI, so converting constructor parameter imports to `import type`
erases them at compile time and breaks dependency injection at runtime
- Right-size CI runners, reducing 8-core usage from 18 jobs to 3:
| Change | Jobs | Rationale |
|--------|------|-----------|
| **Keep 8-core** | `ci-merge-queue/e2e-test`,
`ci-front/front-sb-build`, `ci-front/front-build` | Heavy builds needing
max CPU + memory (10GB NODE_OPTIONS, full Storybook webpack bundling) |
| **8-core → 4-core** | `ci-server` (build, lint-typecheck, validation,
test, integration-test), `ci-front/front-sb-test`,
`ci-zapier/server-setup`, `ci-sdk/sdk-e2e-test` | Already sharded into
10-12 parallel instances, I/O-bound (DB/Redis), or moderate single
builds |
| **8-core → 2-core** | `ci-emails/emails-test` | Trivially lightweight
(build + curl health check) |
| **Removed** | `ci-front/front-chromatic-deployment` | Dead code —
permanently disabled with `if: false` |
- Fix merge queue CI issues:
- **Concurrency**: Use `merge_group.base_ref` instead of unique merge
group ref so new queue entries cancel previous runs
- **Required status checks**: Add `merge_group` trigger to all 6
required CI workflows (front, server, shared, website, docker-compose,
sdk) with `changed-files-check` auto-skipped for merge_group events —
status check jobs auto-pass without re-running full CI
- **Build caching**: Add Nx build cache restore/save to E2E test job
with fallback to `main` branch cache for faster frontend and server
builds
## Test plan
- [ ] CI passes on this PR (verifies lint rule auto-fix works)
- [ ] Verify 4-core runner jobs complete within their 30-minute timeouts
- [ ] Verify merge queue status checks auto-pass (ci-front-status-check,
ci-server-status-check, etc.)
- [ ] Verify merge queue E2E concurrency cancels previous runs when a
new PR enters the queue
## Summary
- **Merge queue optimization**: Created a dedicated
`ci-merge-queue.yaml` workflow that only runs Playwright E2E tests on
`ubuntu-latest-8-cores`. Removed `merge_group` trigger from all 7
existing CI workflows (front, server, shared, website, sdk, zapier,
docker-compose). The merge queue goes from ~30+ parallel jobs to a
single focused E2E job.
- **Label-based merge queue simulation**: Added `run-merge-queue` label
support so developers can trigger the exact merge queue E2E pipeline on
any open PR before it enters the queue.
- **Prettier in lint**: Chained `prettier --check` into `lint` and
`prettier --write` into `lint --configuration=fix` across `nx.json`
defaults, `twenty-front`, and `twenty-server`. Prettier formatting
errors are now caught by `lint` and fixed by `lint:fix` /
`lint:diff-with-main --configuration=fix`.
## After merge (manual repo settings)
Update GitHub branch protection required status checks:
1. Remove old per-workflow merge queue checks (`ci-front-status-check`,
`ci-e2e-status-check`, `ci-server-status-check`, etc.)
2. Add `ci-merge-queue-status-check` as the required check for the merge
queue