* chore: Removed duplicate production build
* fix references
* Move env vars to top level of e2e
* job renaming
* Added env vars to top level of all e2e jobs
* Removed part of cache key that causes issues and is moot
* Using buildjet hardware so the caching works
* clean up
* chore: Add build of API v2 to PR checks
* Actually added the v2 build to the pipeline...
* Added back the original yarn install
* Updated the main PR flow to require API builds before tests